Fast Infrared Mold Heating Furnace
Fast Infrared Mold Heating Furnace
1. When the new mold furnace is used, it needs to be heated to 480 degrees in the period of time. The humidity of the heat insulation material of the new furnace is large.
The rapid expansion of temperature leads to the rapid expansion and deformation of the main body. Therefore, the new furnace is used for the first time in five stages to increase the temperature.
The first stage temperature control is 2 hours at 200 degrees.
The second stage heating control is 2 hours at 300 degrees.
The third stage control is 4 hours at 400 degrees.
The fourth stage disconnects the power supply, the furnace door is half open, so that the smoke and wet gas in the furnace are discharged in time.
In order to prevent the local carbonization of the bore, the heat preservation effect is reduced.
The fifth stage of heating, set the temperature of 480 degrees, 90 minutes to reach the temperature of the mold.
2. After putting the mold into the mold, the temperature is used for two hours.
3. During the use of the mold, it is necessary to avoid the gravity fall when the mold is entered, and the die body is damaged.
The service life is shortened and the guardrails are easily broken.
4. In the process of use, the customer can not change the principle of heating at will, and the heating is too fast.
The mould oxidation damage is very fast, and the temperature is too slow to affect the production progress. Therefore, the product is designed with bore, infrared radiation material, mould frame, and mould frame.
The hot wire is designed according to the grade function of the product.
5. The warranty period is one year. The damage to the original part of the furnace is not within the scope of warranty.
6, in the use of quality problems in the process of timely communication with the manufacturers.
enquiry form:
enquiry content:
You have no items to require